top of page
We are OPEN. If anyone needs any help please call. We are here and want to help.
(720) 410-1273
Gallery
Bathroom Update
Before
Before the floor and accessory remodel
Before
The floor before
After
Before
Before the floor and accessory remodel
Basement Floor
Basement FloorBefore the new floor. | Basement FloorBefore the new floor. | Basement FloorBefore the new floor. |
---|---|---|
Basement FloorBefore the new floor. | Basement FloorThe new floor has really transformed the room. | Basement FloorNew floor. |
Basement FloorNew floor. | Basement FloorNew floor. | Basement FloorNew floor. |
Basement FloorNew floor. |
Dryer Vent cleaned and replaced
Area before cleaningDryer vent in back of the machine. | Area before cleaningThe area behind the dryer. | Area before cleaning |
---|---|---|
Area before cleaningThe underside of the dishwasher and all the dryer lint. | Area before cleaningThe dishwasher area. | Area before cleaningThe dryer line not connected to the exterior. It is just laying in the cabinet blowing lint everywhere. |
Area before cleaningThe backside of the dishwasher | The original vent line. It has deteriorated from so many years of use and not being cleaned. | The inside of the dryer vent. |
Where it was suppose to be attached to the outside. | Area after cleaningCleaned up dishwasher area and the old vent is now gone. | Area after cleaningCleaned up the cabinet before installing new vent. |
Removed the old exterior vent cleaned area for new vent. | New line installed. | New line attached to exterior. |
Area after cleaningNew line to the back of the machine. Line is also properly going into the wall then to the outside. |
Weeds
Lambs Ear that is shoulder height on me. | Garden area needing to be cleaned up. | Locating the fence. |
---|---|---|
Found the raised gardens. | Starting to look much better. |
Tile
BacksplashTile and metal trim added behind the stove. | BacksplashTile and metal trim added to a new kitchen behind the sink. | BacksplashGlass tile added to a new kitchen. |
---|---|---|
Tile added for a hearthTile added for a hearth in front of a gas fireplace that did not have one. |
Minor Electrical and Plumbing
Switch ReplacedMotion light switch stopped working needing to be replaced. | Light SwitchNew switch put in. Customer did not like the original motion switch. | Add outletAdding outlets with conduit. |
---|---|---|
Added outletCompleted new outlet with conduit. | Minor PlumbingAdded new garbage disposal and all new plumbing to a new kitchen. | Sprinkler FixNew pipe needed to charge the sprinkler system. |
SprinklerNew line all in place with a faucet. | SprinklerFinished fix and painted |
Crawl Space Entry
IMG_9310
Added two new pieces of wood to complete crawl space frame for the entry.
zghYfnI6TCOudqQsnZJ%bA
Removed the old drywall and added plywood for the crawl space cover. Two handles added for easy removal and placement. Two blots added to hold the wood in place.
IMG_9310
Added two new pieces of wood to complete crawl space frame for the entry.
1/2
bottom of page